Thermoelectric Power Generator System Optimization and Cost Analysis

By Kaz Yazawa, Kevin Margatan1, Je-Hyeong Bahk1, Ali Shakouri1

1. Purdue University

Simulate cost and efficiency trade-off of a thermoelectric device as a function of material properties and heat transfer coefficients

Launch Tool

You must login before you can run this tool.

Version 1.1 - published on 14 Aug 2014

doi:10.4231/D3028PD8C cite this

This tool is closed source.

View All Supporting Documents

Usage

World usage

Location of all "Thermoelectric Power Generator System Optimization and Cost Analysis" Users Since Its Posting

Simulation Users

231

9 43 47 50 51 56 59 62 67 69 72 74 77 78 80 83 86 86 88 88 90 92 92 95 96 98 98 98 101 108 115 119 125 128 131 133 135 139 145 148 149 154 159 163 164 166 168 169 174 178 182 184 187 193 194 195 198 204 205 210 212 216 220 224 226 229 231

Users By Organization Type
Type Users
Unidentified 157 (67.97%)
Educational - University 60 (25.97%)
National Lab 6 (2.6%)
Industry 4 (1.73%)
Unemployed 2 (0.87%)
Government Agency 2 (0.87%)
Users by Country of Residence
Country Users
us UNITED STATES 27 (44.26%)
in INDIA 8 (13.11%)
kr KOREA, REPUBLIC OF 6 (9.84%)
es SPAIN 4 (6.56%)
cn CHINA 4 (6.56%)
se SWEDEN 3 (4.92%)
ca CANADA 3 (4.92%)
co COLOMBIA 2 (3.28%)
gb UNITED KINGDOM 2 (3.28%)
sg SINGAPORE 2 (3.28%)

Simulation Runs

974

24 290 310 314 317 326 332 341 358 363 370 375 390 395 400 405 411 411 416 421 441 462 462 470 473 478 479 479 484 494 507 518 534 544 547 553 563 575 581 586 601 633 657 667 671 679 683 684 761 772 795 800 822 836 837 845 857 910 916 926 932 944 959 964 968 972 974
Overview
Average Total
Wall Clock Time 7.14 hours 158.9 days
CPU time 1.47 seconds 13.09 minutes
Interaction Time 41.64 minutes 15.44 days